This program is located in a public school and, therefore, the program may not be responsible for correcting the violation.
| Date |
Inspection Type |
Inspection ID |
Inspection Result |
|
|
May 19, 2026 |
Monitoring |
2026-I-LIRO-052273
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.3(a)(1) |
The diagram must be labeled with the planned occupancy or use of all areas of the building and all outside areas to be used or occupied by the school-age child care program. The diagram must show: room dimensions; the age group(s) using each room; the size of the group(s) using each room; kitchens and bathrooms for children and staff; exits; alternate means of egress; plumbing fixtures such as toilets, sinks and drinking fountains; and the outdoor play area showing its relationship to the building. |
Corrected |
|
|
Feb 12, 2026 |
Fire Safety - Other |
2026-I-LIRO-021780
|
No violations cited for this Inspection |
Inspection Conducted Off-Site
|
|
Feb 10, 2026 |
Annual Unannounced |
2026-I-LIRO-014810
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.4(b)(1) |
Evacuation drills must be conducted at least monthly during various hours of operation of the school age child care program. |
Corrected |
|
|
Jan 12, 2026 |
Fire Safety - Other |
2026-I-LIRO-018068
|
No violations cited for this Inspection |
Inspection Conducted Off-Site
|
|
Dec 15, 2025 |
Fire Safety - Other |
2025-I-LIRO-121753
|
No violations cited for this Inspection |
Inspection Conducted Off-Site
|
|
Mar 25, 2025 |
Annual Unannounced |
2025-I-LIRO-016710
|
No violations cited for this Inspection |
|
|
Jan 16, 2025 |
Fire Safety - Other |
2025-I-LIRO-019218
|
No violations cited for this Inspection |
Inspection Conducted Off-Site
|
|
Nov 21, 2024 |
Annual Unannounced |
2024-I-LIRO-097005
|
No violations cited for this Inspection |
|