| Date |
Inspection Type |
Inspection ID |
Inspection Result |
|
|
Mar 27, 2026 |
Annual Unannounced |
2026-I-YRO-010564
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 418-1.3(h) |
Peeling or damaged paint or plaster must be repaired. |
Not Corrected |
| 418-1.4(b)(1) |
Evacuation drills must be conducted at least monthly during various hours of operation of the child day care center. |
Not Corrected |
| 418-1.5(v) |
All matches, lighters, medicines, drugs, cleaning materials, detergents, aerosol cans and other poisonous or toxic materials must be stored in their original containers. Such materials must be used in such a way that they will not contaminate play surfaces, food or food preparation areas, or constitute a hazard to children. Such materials must be kept in a place inaccessible to children. |
Not Corrected |
| 418-1.5(y) |
Protective caps, covers or permanently installed obstructive devices must be used on all electrical outlets that are accessible to children. |
Corrected |
| 418-1.5(z) |
All window and door blind cords, ropes, wires and other strangulation hazards must be secured and inaccessible to children. |
Not Corrected |
| 418-1.15(c)(5) |
The program must maintain on file at the child day care center, available for inspection by the Office or its designees at any time, the following records in a current and accurate manner: daily attendance records, which must be filled out at the time a child arrives and departs, and must include arrival and departure times; |
Corrected |
|
|
Dec 9, 2025 |
Monitoring |
2025-I-YRO-117872
|
No violations cited for this Inspection |
|
|
Sep 18, 2025 |
Monitoring |
2025-I-YRO-099596
|
No violations cited for this Inspection |
|
|
Jun 3, 2025 |
Annual Unannounced |
2025-I-YRO-012109
|
No violations cited for this Inspection |
|
|
Feb 14, 2025 |
Application - Renewal |
2024-I-YRO-100849
|
No violations cited for this Inspection |
|
|
Nov 20, 2024 |
Self Reported Serious Incident |
2024-I-YRO-108578
|
No violations cited for this Inspection |
|
|
Oct 18, 2024 |
Monitoring |
2024-I-YRO-101258
|
No violations cited for this Inspection |
|
|
May 30, 2024 |
Monitoring |
2024-I-YRO-048163
|
No violations cited for this Inspection |
|