| Date |
Inspection Type |
Inspection ID |
Inspection Result |
|
|
Apr 3, 2026 |
Monitoring |
2026-I-RRO-026466
|
No violations cited for this Inspection |
|
|
Feb 18, 2026 |
Annual Unannounced |
2026-I-RRO-010443
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.3(a)(1) |
The diagram must be labeled with the planned occupancy or use of all areas of the building and all outside areas to be used or occupied by the school-age child care program. The diagram must show: room dimensions; the age group(s) using each room; the size of the group(s) using each room; kitchens and bathrooms for children and staff; exits; alternate means of egress; plumbing fixtures such as toilets, sinks and drinking fountains; and the outdoor play area showing its relationship to the building. |
Corrected |
| 414.4(f) |
Adequate means of egress must be provided. Children may be cared for only on such floors as are provided with readily accessible alternate means of egress to other floors, in the case of fire-resistant buildings, and to the outside in the case of non-fire-resistant buildings. |
Corrected |
|
|
Oct 10, 2025 |
Monitoring |
2025-I-RRO-107035
|
No violations cited for this Inspection |
|
|
Apr 14, 2025 |
Monitoring |
2025-I-RRO-033297
|
No violations cited for this Inspection |
|
|
Jan 29, 2025 |
Annual Unannounced |
2025-I-RRO-011968
|
No violations cited for this Inspection |
|
|
Nov 11, 2024 |
Monitoring |
2024-I-RRO-106617
|
No violations cited for this Inspection |
|
|
Sep 20, 2024 |
Application - Renewal |
2024-I-RRO-044751
|
No violations cited for this Inspection |
|