| Date |
Inspection Type |
Inspection ID |
Inspection Result |
|
|
Jan 7, 2026 |
Annual Unannounced |
2026-I-SRO-009775
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 416.4(b)(1) |
Evacuation drills must be conducted at least monthly during the hours of operation of the group family day care home. |
Not Corrected |
| 416.5(b)(4) |
Each program must hold two shelter-in-place drills annually during which procedures and supplies are reviewed. Parents must be made aware of this drill in advance. |
Not Corrected |
|
|
Jun 4, 2025 |
Monitoring |
2025-I-SRO-045345
|
No violations cited for this Inspection |
|
|
Jan 23, 2025 |
Annual Unannounced |
2025-I-SRO-011222
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 416.4(h)(4) |
All paths of egress on the interior and exterior of the home, including corridors, aisles and approaches must be kept free of obstructions, impediments and debris at all times. |
Corrected |
| 416.5(e) |
Porches, decks or stairs with more than two steps must have railings with a barrier extending to the floor or ground to prevent children from falling. Acceptable types of barriers include, but are not limited to, balusters, intermediate rails, and heavy screening. |
Not Corrected |
|