| Date |
Inspection Type |
Inspection ID |
Inspection Result |
|
|
Feb 6, 2026 |
Annual Unannounced |
2026-I-NYCDOH-007357
|
No violations cited for this Inspection |
|
|
Oct 21, 2025 |
Monitoring |
2025-I-NYCDOH-109664
|
No violations cited for this Inspection |
|
|
Jun 24, 2025 |
Annual Unannounced |
2025-I-NYCDOH-008607
|
No violations cited for this Inspection |
|
|
May 15, 2025 |
Application - Renewal |
2025-I-NYCDOH-036656
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.3(g) |
Peeling or damaged paint or plaster must be repaired. |
Corrected |
|
|
Nov 21, 2024 |
No Approved Director |
2024-I-NYCDOH-045926
|
Violations Found
|
Inspection Conducted Off-Site
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.15(b)(23) |
Upon termination or resignation of the director: |
Corrected |
| 414.15(b)(23)(iv) |
Upon termination or resignation of the director: An approved, permanent director must be on-site, performing the duties of the position, within ninety days. |
Corrected |
|