This program is located in a public school and, therefore, the program may not be responsible for correcting the violation.
| Date |
Inspection Type |
Inspection ID |
Inspection Result |
|
|
Mar 9, 2026 |
Annual Unannounced |
2026-I-LIRO-001221
|
No violations cited for this Inspection |
|
|
Nov 10, 2025 |
Monitoring |
2025-I-LIRO-113488
|
No violations cited for this Inspection |
|
|
Sep 9, 2025 |
Monitoring |
2025-I-LIRO-065181
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.8(j) |
When a school-age child care program is in operation, an adequate number of qualified staff must be on duty to protect the health and safety of the children in care. |
Corrected |
| 414.8(k)(1)(ii) |
for a child of school-age through the age of nine years old: the maximum group size is twenty children. |
Corrected |
|
|
Apr 2, 2025 |
Annual Unannounced |
2025-I-LIRO-002040
|
No violations cited for this Inspection |
|
|
Dec 9, 2024 |
Monitoring |
2024-I-LIRO-111889
|
No violations cited for this Inspection |
|
|
Oct 10, 2024 |
Monitoring |
2024-I-LIRO-098798
|
No violations cited for this Inspection |
|
|
May 2, 2024 |
Annual Unannounced |
2024-I-LIRO-001650
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.4(b)(1) |
Evacuation drills must be conducted at least monthly during various hours of operation of the school age child care program. |
Corrected |
| 414.4(h) |
The director or a designated qualified staff member must conduct monthly inspections of the premises to observe possible fire and safety hazards. Any such hazard must be corrected immediately. |
Corrected |
|