| Date |
Inspection Type |
Inspection ID |
Inspection Result |
|
|
Mar 26, 2026 |
Annual Unannounced |
2026-I-NYCDOH-009119
|
No violations cited for this Inspection |
|
|
Nov 19, 2025 |
Monitoring |
2025-I-NYCDOH-116868
|
No violations cited for this Inspection |
|
|
Oct 3, 2025 |
Monitoring |
2025-I-NYCDOH-054099
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.3(g) |
Peeling or damaged paint or plaster must be repaired. |
Corrected |
| 414.3(l)(2) |
Buildings, systems and equipment must be kept in good repair and operate as designed. |
Corrected |
|
|
May 14, 2025 |
Annual Unannounced |
2025-I-NYCDOH-010498
|
Violations Found
|
|
|
|
|
| Regulation |
Description |
Compliance Status |
| 414.3(g) |
Peeling or damaged paint or plaster must be repaired. |
Corrected |
| 414.3(l)(2) |
Buildings, systems and equipment must be kept in good repair and operate as designed. |
Corrected |
| 414.4(h) |
The director or a designated qualified staff member must conduct monthly inspections of the premises to observe possible fire and safety hazards. Any such hazard must be corrected immediately. |
Corrected |
|
|
Aug 7, 2024 |
Application - Renewal |
2024-I-NYCDOH-044690
|
No violations cited for this Inspection |
|